Skip to content

Field evidence

Results, not promises

Every figure we publish is verified by an independent accredited laboratory. Not by us.

Construction site video: High ceiling decontamination, concrete ceiling, decontamination
High ceiling decontamination, Eland arm with Fouine head, HEPA H13 source capture.

Raw footage, no editing. 60 dB in real conditions: the level of a normal conversation.

Signature projects

Where our machines proved themselves

Real, named projects: structural reinforcement of the Glasgow tunnels with Freyssinet, lead-paint removal in a nuclear plant, high-ceiling asbestos decontamination. Click to watch the work, unedited.

Freyssinet International

Perimeter tunnel drilling (Glasgow)

Freyssinet International

Nuclear power plant

Lead paint removal in a nuclear plant

Nuclear power plant

Asbestos site

High ceiling decontamination

Asbestos site

SMH distributor (UK)

Demonstration day (UK distributor SMH)

SMH distributor (UK)

In-house innovation

Automatic wall sander

In-house innovation

Real-world conditions

All our video case studies

Filmed on real client projects with no staging. Filter by machine family, material or machine.

External concrete slab grinding

Tapir · industrial floors · concrete

Tapir on degraded outdoor surface

Tapir · civil works · soiled concrete

Concrete laitance removal

Tapir · resin preparation · smoothed concrete

Intensive floor grinding under containment

Tapir · sensitive floors · concrete

External concrete wall stripping

Gazellomur · civil engineering · raw concrete

Interior concrete wall stripping

Gazellomur · renovation · concrete

Outdoor wall paint stripping

Gazellomur · facade maintenance · paint on concrete

Concrete wall planing with Gazellomur

Gazellomur · planing · concrete

Gazellomur wall decontamination

Gazellomur · decontamination · concrete wall

Bush hammering of bridge concrete

Potam Bush Hammer · civil engineering · reinforced concrete

Bush hammering on viaduct wall

Potam Bush Hammer · civil engineering · reinforced concrete

Raw block wall sanding

Petit Potam · renovation · concrete block

Why independent testing?

Any manufacturer can publish their own numbers

We chose to have our equipment validated by UKAS-accredited laboratories, in line with the HSG248 protocol. The results speak for themselves: on the British hospital site, the operator personal exposure measured was 0.02 f/ml against a regulatory threshold of 0.1 f/ml. Five times below the threshold, measured by a third party with no commercial stake in the result.

This is the traceability we want to offer our customers: figures that hold up in audit, not marketing claims.

Independent study

Strain measured by sensors, not by us

Operators were fitted with 8 sensors each to compare drilling and chiselling work at height, with and without our physical assistance solutions (remote arm, balancer). Measured differences:

-56 % vibration transmitted to the forearms
÷3 operator muscular effort
÷3 postural risk on back and shoulders
-64 % muscular activity in wall drilling

"Vibration and biomechanics" study run by Distrimo (Bouygues Construction group) with Moten Technologies sensors, on the full-scale Scale One test platform. Protocol: 2 operators, 25 measured work situations, 8 sensors per operator, drilling and chiselling on floor, wall and core wall.

Next step

You have seen the proof. Let's talk about your site.

Quote within 24 h. On-site demo with your own materials. Designed, assembled and tested in Roanne.

04 77 60 60 74 Request a quote