How long will your floor, wall or ceiling grinding job take?
Enter your surface and substrate to get an estimated jobsite time with an adapted Sept Tools machine, based on official throughput measured in real jobsite conditions. No invented figures: where a sourced manual comparison exists, it is shown too.
Where does this throughput data come from?
The Sept Tools throughput shown here is taken directly from our published productivity tables by surface (floor, wall, ceiling): Tapir XTT330 on floors, Petit Potam XM165 set with Mygale gantry on walls, Fouine XB165 on a Gazelle trolley or Eland arm on ceilings. These are figures measured in real jobsite conditions, not rounded marketing numbers.
The manual method comparison only appears where an official figure exists: on ceilings, manual pole work caps at 2 to 3 m²/h before physical saturation within 90 minutes. For floors and walls, lacking a verified manual reference, the calculator would rather show nothing than invent an order of magnitude.
Sizing a jobsite before you bid
- 1Quickly estimate a realistic jobsite duration to size a crew and plan other trades.
- 2Compare several scenarios (number of operators, hours per day) before locking a schedule.
- 3Objectively show a client the real time saved by a Sept Tools brushless machine versus a manual method, where the data allows it.
Frequently asked questions about jobsite output
How do you calculate jobsite output for grinding, bush hammering or planing?
What is the m²/h throughput of Sept Tools machines on floors, walls and ceilings?
Why does throughput vary so much depending on the substrate?
Does the calculator compare against the manual method?
Are these estimates guaranteed for my jobsite?
Need a precise quote for your actual jobsite?
Our team reviews your real constraints (access, height, substrate condition, class H extraction) to refine this estimate or arrange an on-site demonstration. No commitment.